Total number of workers engaged in building the EuRICAA mega infrahighway

01 Jan 1970, 03:00
61

Number of workers engaged in building the highway, people/km

Designers, land surveyors, geodesists, and others

Drivers, excavators, bulldozer operators and others.

Highly specialized experts

Auxiliary workers

7

21

13

51

 

 

 

 

Total:

92

 

 

 

 

On average, 92 people will be needed to work on one kilometer of highway one lane wide.

This volume of work will be done in 4 years, correspondingly 250 meters will be built in one year.

Number of workers per year

Construction time (years)

Number of lanes

Highway length (km)

92

1

1

0,25

368

1

1

1

3 680

1

10

1

12 880 000

20

10

70 000

 

A minimum of 12,880,000 production workers and engineering personnel will be engaged in building the EuRICAA mega infrahighway over a period of 20 years. Furthermore, building EuRICAA will provide jobs for specialists who will serve in related spheres (supplying building material, developing technology, producing minerals, and so on)—around 5,890,000 people.

Total:  19,000,000 jobs will be created.

 